MANILA, Philippines — The Energy Regulatory Commission (ERC) announced that it has issued the 2025 Amended Rules Enabling the Net-Metering Program for Renewable Energy.
ERC amends net-metering rules to expand renewable energy options
The regulator said this development aimed to streamline the implementation of the net-metering program and make renewable energy (RE) adoption more accessible to qualified end-users.
Following a series of public consultations and careful review of stakeholders’ inputs, the ERC issued Resolution 15, Series of 2025, introducing key amendments aimed at strengthening consumer protection and simplifying processes for availing of the program., This news data comes from:http://www.erlvyiwan.com
As per the ERC, one of the key amendments permits the banking and rollover of net-metering credits toward a qualified end-user's electricity usage across current and future billing periods.

It added that in the event of a property ownership change, the credits may be transferred to the new owner, subject to conditions such as a conforme letter from the original owner.
Net-metering allows customers of distribution utilities to install an on-site Renewable Energy (RE) facility not exceeding 100 kilowatts (kW) in capacity so they can generate electricity for their own use.
In turn, any electricity generated that is not consumed by the customer is automatically exported to the distribution utility's’s distribution system.
- Australia expels Iran ambassador over antisemitic attacks
- Zelenskyy seeks talks with Trump and European leaders on slow progress of peace efforts with Russia
- 'No way' US troops can invade Venezuela, says Maduro
- Israel military says controls 40 percent of Gaza City
- Heavy rain falls in parts of Southeast Asia after tropical storm blows into Vietnam
- 'Ondoy'-level rains swamp Quezon City
- Leviste files charges against DPWH engineer who tried to bribe him
- ChatGPT to get parental controls after teen's death
- Indonesia hosts annual US-led combat drills with Indo-Pacific allies
- Court rules on subdivision open spaces, road lots